Facility management PPM checklist: build one that works
List every asset, write a short checklist for each type, set its frequency and give each visit an owner, a date and a record that the client can see.
Written by The iCRM team
Published 8 min read
- 4 trades HVAC, fire, plumbing and electrical
- 5 frequencies From weekly to yearly
- 1 template For each type of asset
- 1 owner With a date for every visit
On this page
- Key takeaways
- Step 1: list the assets in every building
- Step 2: group the assets by trade
- Step 3: write one checklist for each asset type
- Step 4: set the frequency for each check
- Step 5: give every visit an owner and a date
- Step 6: keep the record and share it
- Doing it in iCRM
- A facility management PPM checklist
- Sources
A facility management PPM checklist works when it is short, written for one type of asset and tied to a frequency and an owner. List the assets in each building, write one checklist per asset type, schedule each one weekly, monthly, quarterly, half yearly or yearly, and keep the record of every visit where your client can see it.
Key takeaways
- Start with an asset list for each building, villa or office, not with a blank form.
- Write one checklist for each type of asset and reuse it everywhere.
- Set a frequency for every check, and follow the manufacturer, the contract and the authorities first.
- Give every visit an owner and a due date, and keep the record with the asset.
- Treat fire and life safety work as its own stream, under the rules of your emirateโs civil defence.
Step 1: list the assets in every building
A PPM plan is only as good as its asset list. Walk each site and note what is there before you write a single check.
For each asset, record:
- What it is, such as a split unit, a chiller, a fire pump or a distribution board.
- Where it is: building, floor, room or roof.
- Its make, model and serial number, where you can read them.
- Its install date and any warranty end date.
- The manufacturerโs service guidance, if you have it.
A villa may have a handful of assets. An office tower may have hundreds. The method is the same; only the length of the list changes.
Step 2: group the assets by trade
Most PPM in UAE buildings falls into four trades. Grouping assets this way lets you send the right technician and keep specialist work apart.
| Trade | Typical assets | Who usually does it |
|---|---|---|
| HVAC | Split and ducted units, fan coil units, chillers, cooling towers, exhaust fans | Your HVAC technicians |
| Fire and life safety | Fire alarm panels, detectors, sprinklers, fire pumps, extinguishers, emergency lights | A contractor allowed by civil defence, where the rules require it |
| Plumbing | Water tanks, booster pumps, water heaters, drains, valves | Your plumbing team |
| Electrical | Distribution boards, generators, earthing, lighting, sockets | Qualified electricians |
Fire and life safety is the stream to handle with most care. Each emirateโs civil defence authority sets the rules for these systems, and the UAE Fire and Life Safety Code applies to them. Check the current requirements with the authority before you plan these visits, and keep the certificates and reports they ask for.
Step 3: write one checklist for each asset type
A checklist should fit on one screen. Each line is one thing the technician looks at or does, with a clear result: done, fault found, or not possible.
An example HVAC checklist for a split unit
- Clean or replace the filters.
- Check the drain line and tray for blockages and leaks.
- Check the supply air temperature.
- Clean the indoor coil and the fan.
- Check the outdoor unit for dust, damage and airflow.
- Note any unusual noise, smell or vibration.
An example plumbing checklist for a water tank
- Check the tank cover, vents and overflow.
- Look for leaks, rust or damage.
- Note the water level and the float valve.
- Record whether cleaning is due under your contract and local rules.
An example electrical checklist for a distribution board
- Check the board for heat marks, damage and loose covers.
- Check that every circuit is labelled.
- Test the residual current devices, where your procedure says so.
- Note any breaker that trips often.
Keep the wording plain. A technician on a roof in August should be able to read each line in a few seconds.
Step 4: set the frequency for each check
Not every check is done at every visit. Some are monthly, some yearly. Put the frequency on each line, so one asset can carry several schedules.
The table below is a starting plan, not a rule. Always put the manufacturerโs guidance, your contract and the authoritiesโ requirements first.
| Frequency | HVAC | Plumbing | Electrical | Fire and life safety |
|---|---|---|---|---|
| Weekly | Plant room walk round | Pump room walk round | Generator visual check | Panel status check |
| Monthly | Filters and drains | Pumps and valves | Emergency lights test | As your approved contractor advises |
| Quarterly | Coils, fans, outdoor units | Water heaters | Boards and labels | As the authority requires |
| Half yearly | Cooling tower service | Tanks, per local rules | Earthing visual check | As the authority requires |
| Yearly | Full service of each unit | Full system check | Full inspection and testing | Yearly inspection and certificate, where required |
In the UAE, HVAC deserves extra attention. Units work hard for most of the year, so many teams bring filter and drain checks forward in the hottest months.
Step 5: give every visit an owner and a date
A schedule nobody owns does not get done. Turn each due check into a visit with:
- One named technician or team.
- A due date and a time window agreed with the building.
- The checklist for each asset on the visit.
- Access notes, such as who holds the plant room key.
Plan the month ahead and leave room for reactive call outs. When a visit is missed, it should be plain to see the next morning.
Step 6: keep the record and share it
The record of each visit is what your client pays for. It shows the work was done, and it is what you show when a fault or a dispute comes up.
A good PPM record holds:
- The asset, the date and the technician.
- Each check with its result.
- Faults found, photos and the follow-up job raised.
- The next due date.
If you hold your clientsโ contact details, such as tenantsโ names and phone numbers, look after them. The UAEโs personal data protection law sets rules on how personal data is collected, used and kept.
When you bill a PPM contract, a VAT registered business issues tax invoices that meet the Federal Tax Authorityโs rules. The UAE is also bringing in e-invoicing in phases, so check where your business falls in the Ministry of Financeโs plan.
Doing it in iCRM
These features are part of iCRM for facility management in the UAE.
- Checklist templates. Write the checklist for each asset type once, then start every visit from it, so the work is done the same way on every site.
- Checklists. Technicians tick off each step on site, see what is left and leave a record of what was done.
- Offline mode. Keep working in plant rooms, basements and roofs where the signal is poor, and carry on when it returns.
- Calendar and task management. See every visit on one calendar, give each one an owner and a due date, and see what is due today.
- Automated reminders. Get reminded of visits and due dates without setting an alarm.
- Staff management and kanban boards. See who is working on what, and move each visit across a board as the work moves on.
- Customer management and contact management. Keep every building with its contacts, history and open work, and note who decides and who pays.
- Customer portal and document sharing. Share visit records and documents with the client in one place.
- Document expiry tracking. Know when certificates, licences and permits run out, and renew in time.
- Invoicing, tax management and payment tracking. Invoice the contract, apply VAT to each item and see which invoices are paid or overdue.
- Team messaging and customer support chat. Share updates on a job with your team, and answer the clientโs questions.
A facility management PPM checklist
- Every building, villa and office has an asset list.
- Every asset has its location, make, model and install date.
- Assets are grouped by HVAC, fire and life safety, plumbing and electrical.
- Each asset type has one short checklist.
- Every check has a frequency, set from the manufacturer, the contract and the authorities.
- Fire and life safety work follows your emirateโs civil defence rules.
- Every visit has an owner, a date and access notes.
- Every visit leaves a record with results, faults and the next due date.
- Certificates and their expiry dates are tracked.
- Contract invoices meet the VAT rules.
Sources
Related articles
-
Fleet document expiry tracking: quick tips for the UAE
Keep one register of every Mulkiya, insurance policy, driver licence and permit, with an owner and reminders at 60, 30 and 7 days before each expiry date.
- Checklist
- 2 tables
- 5 questions answered
-
Freight quotation UAE: how to quote fast and clearly
A good UAE freight quote names the route, cargo, Incoterm, every charge, the currency, the VAT treatment and a validity date, and goes out the same day.
- Checklist
- 2 tables
- 5 questions answered
-
Hotel group booking proposal: a guide for UAE hotels
A UAE hotel group booking proposal wins when rooms, meeting space, packages, fees and 5% VAT sit on one page in AED, with clear terms and an online acceptance.
- Checklist
- 2 tables
- 6 questions answered
Recognized with numerous awards
Support, security, uptime and results, with the figures behind each badge.
FAQ
Frequently asked questions
Straight answers to what people ask most about iCRM.
Set up for your industry
Pick yours and its features come ready.
- Automotive Dealers
- Beauty Salons
- Construction Companies
- Consulting Firms
- Online Retail
- Event Management
- Facility Management
- Healthcare Clinics
- Hospitality Businesses
- Logistics Companies
- Real Estate
- Travel Agencies
-
What is a PPM checklist in facility management?
It is the list of checks a technician carries out on an asset during a planned preventive maintenance visit, with the frequency of each check, so the work is done the same way every time and recorded.
-
How often should PPM be done on HVAC in the UAE?
Follow the manufacturer's schedule and your contract first. Many teams check filters and drains monthly in the hot months and do a fuller service every quarter, because units run hard for most of the year.
-
Who can maintain fire safety systems in a UAE building?
Fire alarm, sprinkler and other life safety systems fall under the civil defence authority of each emirate, which sets who may maintain them and what records it expects. Check its current rules before you plan these visits.
-
Should one checklist cover every asset in a building?
No. Write one short checklist for each type of asset, such as a split unit, a booster pump or a distribution board, and reuse it on every asset of that type.
-
What should a PPM record show the client?
The asset, the date of the visit, who did it, each check with its result, any fault found, photos where they help, and the next due date. A client who can see this trusts the contract more.
-
Do I charge VAT on a PPM contract in the UAE?
A VAT registered business charges VAT on taxable services and issues tax invoices that meet the Federal Tax Authority's rules. Ask your tax adviser how your contract and its billing periods should be invoiced.
Get started with iCRM
Leads, quotes, work, invoices and payments in one app, set up for the way your industry works.
- 99% Uptime guarantee
- ISO ISO-aligned security
- 24/7 Response support
- GDPR GDPR compliant
- SSL SSL encrypted
-
12
Industries Each with its own features
-
45
Features Across those industries
-
11
Areas of work From leads to payments
-
3
Editions India, France and UAE